The Royal Papworth Hospital is a brand new facility on the Cambridge Biomedical Campus, and is part of the international centre of excellence in biomedical research. For this construction by Skanska, worth approximately £165m,
Daikin Applied UK supplied 60 HTM compliant Professional Air Handling Units – 42 Internal and 18 External, with various air volumes – plus 3 water cooled chillers EWWQ 430 L SS, all totalling 1MW of cooling. It is one of the biggest health sector construction projects in the UK. The contract included design, build, on-site installation, commissioning and maintenance.
The early appointment of Daikin Applied as the specified manufacturer allowed our engineering team to custom design each AHU unit to provide a bespoke solution and satisfy multi-space air conditioning requirements.
Daikin Applied’s unique modular design has provided complete design flexibility with no restrictions to satisfy a bespoke solution to meet tight building and plant space limitations internally and externally. To provide 1MW of cooling, Daikin Applied Engineers collaborated with the Skanska design team to modify the original design of air cooled installation, achieving a lower cost and improved efficiency water cooled solution.
Spatial restrictions are always an issue for plant rooms, particularly in hospitals where the strict HTM maintenance requirements must be met.
Use of the latest high efficiency EC motor, low pressure drop and low maintenance components were the key features of the proposal by Daikin Applied. This was adopted by the Skanska design team as it exceeded the clients expectations in unit size, performance, efficiency and budget.
During the commissioning period further design restrictions imposed by the site mechanical installation created additional challenges to our site commissioning team. Our highly qualified site team responded to these issues by modifying the AHU designs in collaboration with our manufacturing facilities located in the UK, while our experienced project manager ensured the delivery and commissioning of the units was completed within the original time scale and budget.
To discuss your heating, cooling and sanitary hot water needs within your healthcare facility, with a qualified member of staff, please contact us on 0345 565 2700.